Works on the runway and taxiways at Zagreb Airport

In accordance with the published NOTAM (Notice To Air Missions) and the AIP SUPs of the Croatian Air Traffic Control, we are transmitting information about the works at Franjo Tuđman Airport. According to SUP 006/2022 published in the AIP, the works were announced as early as November 17, 2022. Later, the SUP was expanded, mostly with the same information, and the same was published in SUP 002/2023 published on January 12, 2023. Considering the works were announced in the AIP, which is a publicly available document, all interested parties including airlines such as Ryanair (currently canceling flights due to runway closures) had information available in time. Why Ryanair continued to sell tickets on flights affected, why the flights were not moved to an earlier hour and why they are canceling flights remains unknown.

As a reminder, the AIP (Aeronautical Information Publication) is defined by the International Civil Aviation Organization (ICAO) as a publication issued by or with the authorization of the state and which contains aeronautical information of a permanent nature essential for air navigation. For the purpose of air traffic safety, air carriers or their operational centers are obliged to follow the information published in the AIP.

SUPs and NOTAMs additionally note that the closure of the airport includes all traffic, without exception, even for emergency flights, flights for search and rescue purposes, etc.

Below we transmit SUPs from AIP and NOTAM announcing works on runway 04/22 and taxiway F, exclusively at night, starting from May 1, 2023. The entire airport will be closed from May 2 – 31 2023 from 23:00 to 06:30 local time. The works will include changing the asphalt surface in a length of 2,262 m (between taxiways B and E), and on taxiway F between taxiways C and E. Aditionally, AvioRadar learns that works on the approach lighting for runway 22 as well as ILS calibration will be included in the works.

NOTAM

A1038/23 - TWY F CLOSED TO ALL TFC DUE TO WIP. DAILY 2100-0425, 02 MAY 21:00 2023 UNTIL
31 MAY 04:25 2023. CREATED: 14 APR 10:08 2023
A1037/23 - RWY04/22 CLOSED TO ALL TFC (INCLUDING STS/EMER, STS/HOSP, 
STS/SAR, STS/HEAD, STS/STATE, STS/HUM) DUE TO WIP. DAILY 2100-0425, 02 MAY 21:00
2023 UNTIL 31 MAY 04:25 2023. CREATED: 14 APR 10:06 2023
A1030/23 - RWY04 CLSD DUE TO WIP ON RWY LIGHTING. 19 APR 21:00 2023 UNTIL 20 APR 03:30 2023.
CREATED: 13 APR 12:17 2023
A1029/23 - RWY22 CLSD DUE TO WIP ON RWY LIGHTING. 18 APR 21:00 2023 UNTIL 19 APR 03:30 2023.
CREATED: 13 APR 12:14 2023
A1004/23 - ILS RWY22 NOT AVBL DUE TO FLIGHT CHECK.
DO NOT USE, FALSE INDICATION POSSIBLE.
CHECK AVAILABILITY OF RELATED FLIGHT PROCEDURES AND ROUTES. 24 APR 08:00 2023
UNTIL 24 APR 13:00 2023. CREATED: 12 APR 08:19 2023
A1003/23 - ILS RWY04 NOT AVBL DUE TO FLIGHT CHECK.
DO NOT USE, FALSE INDICATION POSSIBLE.
CHECK AVAILABILITY OF RELATED FLIGHT PROCEDURES AND ROUTES. 24 APR 08:00 2023
UNTIL 24 APR 13:00 2023. CREATED: 12 APR 08:18 2023
A1002/23 - ILS RWY22 NOT AVBL DUE TO FLIGHT CHECK.
DO NOT USE, FALSE INDICATION POSSIBLE.
CHECK AVAILABILITY OF RELATED FLIGHT PROCEDURES AND ROUTES. 17 APR 08:00 2023
UNTIL 17 APR 13:00 2023. CREATED: 12 APR 08:17 2023
A1001/23 - ILS RWY04 NOT AVBL DUE TO FLIGHT CHECK.
DO NOT USE, FALSE INDICATION POSSIBLE.
CHECK AVAILABILITY OF RELATED FLIGHT PROCEDURES AND ROUTES. 17 APR 08:00 2023
UNTIL 17 APR 13:00 2023. CREATED: 12 APR 08:16 2023
A0945/23 - TRIGGER NOTAM - PERM AIRAC AIP AMDT 004/2023 WEF 18 MAY 2023
- RESCUE AND FIRE FIGHTING SERVICES - AVAILABILITY OF AD CAT FOR 
FIRE FIGHTING CHANGED
- NEW APDC WEST
- NEW VOC. 18 MAY 00:00 2023 UNTIL 31 MAY 23:59 2023. CREATED: 06 APR 11:40
2023
A0767/23 - FIREFIGHTING AND RESCUE CAT CHANGED AS FLW:
- CAT 6 AVBL 2100-0500
- CAT 7 AVBL 0500-2100
- CAT 8 AND 9 AVBL ON REQUEST IN WRITTEN FORM NOT LATER THAN
24HR BEFORE THE AIRCRAFT OPERATION.
REF AIP LDZA AD 2-3, ITEM AD 2.6. 25 MAR 23:00 2023 UNTIL 30 APR 22:00 2023.
CREATED: 24 MAR 10:10 2023
A0766/23 - ZAGREB AIRPORT HANDLING SERVICE OPERATIONAL HOURS CHANGED AS FLW:
0330-2315.
2315-0330 ON REQUEST UNTIL 1900UTC IN WRITTEN FORM VIA E-MAIL:
ZAGOCC(AT)HAVAS.NET AND KOORDINATORI(AT)ZAG.AERO
REF AIP LDZA AD 2.3. 26 MAR 03:30 2023 UNTIL 30 APR 03:30 2023. CREATED: 24
MAR 10:05 2023
A0764/23 - AD CLOSED TO ALL TFC.
LANDINGS DURING CLOSURE TIME POSSIBLE ONLY ON REQUEST UNTIL 1900UTC
IN WRITTEN FORM VIA E-MAIL: KOORDINATORI(AT)ZAG.AERO. DAILY 2315-0330, 26 MAR
23:15 2023 UNTIL 30 APR 03:30 2023. CREATED: 24 MAR 09:55 2023
A0583/23 - CONSTRUCTION AREA (BOX) DEFINED BY FLW COORD:
454408N 0160430E - 454408N 0160441E - 454416N 0160441E -
454416N 0160430E - 454408N 0160430E.
ELEV/HGT: 449FT AMSL/101FT AGL. 09 MAR 18:45 2023 UNTIL 09 JUN 23:59 2023 ESTIMATED.
CREATED: 09 MAR 18:46 2023
A0580/23 - OBSTACLE ERECTED AT PSN: 454410N 0160434E
ELEV/HGT: 490FT MSL/141FT AGL
TYPE OF OBSTACLE: CONSTRUCTION CRANE
OPERATING RADIUS: 197FT/60M
ICAO MARKED AND LIGHTED. 15 MAR 07:00 2023 UNTIL 15 JUN 23:59 2023 ESTIMATED.
CREATED: 09 MAR 13:59 2023
A0254/23 - PARKING PSN WB CLOSED. 03 FEB 17:23 2023 UNTIL 27 APR 22:00 2023. CREATED: 03
FEB 17:23 2023
A0253/23 - TAXILANE W IN FRONT OF PSN W1 AND PSN W2 CLSD. 03 FEB 17:23 2023 UNTIL 27 APR
22:00 2023. CREATED: 03 FEB 17:23 2023
A0199/23 - PARKING PSN G37, G38, G39, G48, G49, G50, G51, G52 AND G53 CLOSED. 31 JAN 07:27
2023 UNTIL 30 APR 22:00 2023. CREATED: 31 JAN 07:28 2023
A0183/23 - ACFT EXIT FROM PRKG PSN W1 AND W2 IS MANDATORY BY USING 
PUSH-BACK. 
REF AIP LDZA AD 2.24.2 APDC WEST-1. 27 JAN 15:36 2023 UNTIL 27 APR 22:00 2023.
CREATED: 27 JAN 15:37 202

On February 9, 2023, a new SUP was published announcing works on the meteorological infrastructure, which should not interfere with the normal operation of the airport.


The concessionaire company of Zagreb Airport explains: „In the period from May 2 to 31, 2023, from 11:00 p.m. to 6:25 a.m., regular maintenance work will take place on the runway and taxiway marked “F”, as well as work on the replacement of the approach lighting system of direction 22, at Franjo Tuđman Airport. These are works that have been planned in advance, and will take place in the month of May due to weather conditions and the necessary execution technology. The execution date and duration of the works were announced in a timely manner to all airlines flying to Zagreb, so that they could coordinate their flight schedules.

We advise passengers to contact the airline with which they plan to travel directly for all flight inquiries.“

NOTE: Visual representations of works, including clips from AIP, are the intellectual property of Croatian Air Navigation Control. Copyright: Croatia Control Ltd.

Leave a Reply