
© Boeing
Boeing brought together around 500 employees in Seattle to mark the completion of the multi-year effort to certify the 737-7 and to recognize the teams involved in the development and testing of the smallest member of the 737 MAX family.
The event was held at the Seattle Delivery Center after the U.S. Federal Aviation Administration (FAA) certified the 737-7 for commercial service in early August. Rather than focusing solely on the regulatory milestone, Boeing dedicated the gathering to the employees who had spent years working on development, testing, regulatory activities and the resolution of technical challenges.
Among the guests were Stephanie Pope, president and CEO of Boeing Commercial Airplanes, Mike Sinnett, senior vice president of Product Strategy, Product Development and Development Programs, and Kurt Kinder, Southwest Airlines vice president of Maintenance Planning and Tech Ops.
The programme included remarks from company leadership, employee recognition and a video tribute highlighting the teamwork behind the certification effort.
“I’m so beyond proud to be able to share that with my family and one day tell my kids, mom was part of this team that got this plane flying,” said Jenna Herman, senior business operations specialist supporting 737 Development.
The certification programme involved nearly 700 flight-test hours across 440 test flights, as well as approximately 350 hours of ground testing. The process also included human factors reviews, system safety assessments, tens of thousands of pages of documentation and numerous formal meetings with the FAA.
Shannon Timke, lead test director for 737-7 Flight Test, said the completion of certification was the result of a long-running effort involving a large number of people.
“It’s been a long time coming, and a lot of work and a lot of resilience by a lot of different people. What it means to me is that we, as a company, can show that we will do the right thing, we’ll do it together, and we will provide a product to not only our airline customers, but to the flying public, which includes our friends and families,” Timke said.
Employees who had worked on the programme since its earlier stages also reflected on the significance of reaching the milestone.
“I was a design engineer on this project back in 2017, so being able to circle back and see it through to the very end is incredibly meaningful. It’s still surreal. It’s nice to take a pause, celebrate and reflect on what an entire team of people has accomplished,” said Mindy Pancoast, senior manager of Regulatory Administration and Airworthiness.
Chris Duffy, 737-7 propulsion analysis engineer, noted that employees whose work is largely office-based do not often have the opportunity to see the finished result of their work directly.
“Being in the office, a little separated from the factory, it’s not every day you get to see the actual finished product of your labor. To be here and see the airplane today just makes me very proud to be a Boeing engineer and to be part of this accomplishment,” Duffy said.
The 737-7 is the smallest member of the 737 MAX family and also the variant with the longest advertised range, at up to 3,800 nautical miles, or approximately 7,040 kilometres. Boeing says the aircraft is particularly suited to operations from airports at high elevations and in hot climates.
According to the manufacturer, the aircraft reduces fuel consumption and carbon dioxide emissions by around 20% compared with the aircraft it typically replaces, while reducing the noise footprint by approximately 50%.
For Boeing, the gathering in Seattle marked the conclusion of an important chapter in the 737-7 programme, but above all provided an opportunity to recognize the employees whose years of development, testing and regulatory work brought the aircraft through certification.